Each year, the Town of Montreal West undertakes different infrastructure projects across Town. Here you will find a list of the major road work projects under way.

As with any large-scale project, there will be some inconvenience during the work and we appreciate your patience and understanding. We are convinced that the short-term inconvenience will be minimal compared to the long-term benefits.

Citizens’ responsibilities

  • For your safety, we urge you to follow worksite instructions (fences, barricades, etc.) and to respect all temporary detours and signage.
  • You must inform Public Works if you require direct access to your property during the work (moving, delivery or transportation, etc.).
  • If you have any inquiries, comments or complaints, please use the form available on this page and select Public Works in the service section, and Infrastructure works 2021 as the subject.

Reconstruction of Fenwick Avenue

Work in progress

September 21, 2021: notice to residents of the area

A new gas leak occurred during the infrastructure work on Fenwick Street on September 21, 2021.  The safety protocol was immediately put in place by the Fire Department (SIM) and the leak was contained very quickly. All parties involved are working to ensure the safe completion of the project.

  • Reconstruction of the sewer and water systems
  • Replacement of the roadbed, sidewalks, streetlights and fire hydrants

Work began on July 6, 2021. Temporary water lines will be installed and connected to all affected homes. Excavation will begin after the temporary water lines are installed.

The entire project is expected to be completed by mid-October.

During this time, the street sections affected by the work will be closed to traffic, especially during the day. Access for emergency vehicles will be maintained at all times.

  Avizo's presentation from the information session

  Information following the gas leak of August 30, 2021


Asphalt Resurfacing of Avon Road

Work completed

  • Resurfacing of the asphalt road surface
  • Localized repairs to the road foundation of Avon Road between Westminster South and Ronald Dr.

Infrastructure repairs on Wolseley North Avenue (between Radcliffe and Edinburgh)

  • Excavation and foundation work
  • Replacement of the storm and sanitary sewers
  • Replacement of the water main
  • Replacement of all service connections between the main pipe and the lot line
  • Replacement of the existing street foundation, pavement and sidewalks

Rehabilitation of Crestwood Avenue

  • Excavation and foundation work
  • Replacement of sewer main
  • Replacement of water main
  • Replacement of concrete sidewalks and asphalt street surface